Engineering reliable power. Built over three decades. Built over three decades.

Since 1988, Contronics Switchgear has designed, manufactured and commissioned mission-critical control panels for utilities, industries and infrastructure - backed by in-house testing, ISO 9001:2015 quality systems and a global service footprint.

1988
FOUNDED
35+
YEARS
ISO
9001:2015

From a single workshop to a global power-engineering partner.

Six chapters that shaped Contronics — engineered, certified and commissioned, one milestone at a time.

1988

CHAPTER 1

Founded

Contronics established as a power control panel manufacturer in India.

1995

CHAPTER 2

HT Panel Capability

Expanded into high-tension switchgear and protection systems.

2005

CHAPTER 3

ISO 9001 Certified

Quality management system certified, formal testing facility commissioned.

2012

CHAPTER 4

First Africa Project

Commissioned utility-grade panels for East African transmission grid.

2018

CHAPTER 5

Sharika Partnership

Strategic partnership extending global reach into Middle East & Africa.

Today

CHAPTER 6

Global Engineering Partner

Active projects across India, Kenya, Nepal, Somalia and beyond.

35+
YEARS OF ENGINEERING EXCELLENCE
132kV
HIGH-VOLTAGE PANEL EXPERTISE
ISO 9001
:2015 QUALITY CERTIFIED
CONTINENTS WITH ACTIVE PROJECTS

"Power is trust. Every panel we ship carries the reputation of an engineer who signed it."

For more than 35 years we have built one thing: switchgear that operators can rely on at three in the morning, in monsoons, in deserts, in remote utility yards. That mandate hasn't changed — only the scale.

Today our panels protect hospitals, water utilities, cement plants and transmission substations across three continents. Tomorrow we will deepen that footprint with smarter, greener, more connected control infrastructure — without compromising the craft that brought us here.

Managing Director
Contronics Switchgear (I) Pvt. Ltd.

Six disciplines. One engineering team.

From single-line diagrams to lifetime maintenance, every stage of a Contronics project is owned in-house — eliminating handoffs, accelerating delivery and guaranteeing accountability from concept to commissioning.

  • Design & Engineering
  • Manufacturing
  • Testing
  • Installation
  • Commissioning
  • Lifecycle Service

CONTRONICS

ENGINEERING

Design & Engineering
Manufacturing
Testing
Installation
Commissioning
Lifecycle Service

A disciplined, repeatable manufacturing process.

Every panel passes through the same six engineered stages - traceable, documented and quality-gated.

STEP 01

Specification

Customer brief, SLD review, BOM engineering

STEP 02

Design

GA & schematic drawings, approvals, simulation

STEP 03

Fabrication

Sheet-metal, powder coating, busbar machining

STEP 04

Wiring

Component mounting, ferruling, harness assembly

STEP 05

Testing

FAT, HV, IR, primary & secondary injection

STEP 06

Dispatch

Crating, logistics, site commissioning support

A disciplined, repeatable manufacturing process.

Every panel passes through the same six engineered stages — traceable, documented and quality-gated.

Up to 11kV

High Voltage

Dielectric withstand testing

1000V Megger

Insulation Resistance

Every circuit, every panel

5000A

Primary Injection

CT ratio & relay coordination

Numerical Relays

Secondary Injection

Protection scheme validation

100%

Functional

Logic, interlock & SCADA checks

ISO 9001

Routine Inspection

Documented & traceable

Power Your Projects with Trusted Electrical Solutions

Partner with us for precision-engineered switchgear and panel solutions designed to deliver performance, safety, and long-term reliability.

Reliability

Engineering choices judged by decades of field performance, not by datasheet alone.

Precision

Tolerances measured, documented and verified at every manufacturing stage.

Partnership

Long-term technical relationships with utilities, EPCs and end customers.

Sustainability

Energy-efficient designs supporting cleaner, smarter power infrastructure.

LET'S ENGINEER TOGETHER

Have a power control challenge? Our engineers want to hear it.

TOP